Industrial Case Studies

NTG Precision Engineers Ltd

I led the fit out of a new 46,000 sq. ft. industrial unit in Team Valley and transfered the entire operation to the new site.

 

Feasibility Study for large scale site expansion at the Houghton-Le-Spring site

I led a feasibility study of a significant capacity expansion project for the site involving the development of novel process equipment and significant civils and service utilities scope.

Project Manager for the transfer and installation of a complete radiator factory from South Wales to Team Valley

I was appointed in September ‘19, as project lead of the Gateshead side and Principal Designer (Construction Design & Management regulations 2015). I carried out the following tasks:

  • Quickly generated a 3D model of the proposed new factory layout, which I used to gain firm agreement from the site management
  • Designed and specified the civil and structural requirements, then tendered for this work and appointed several contractors on an accelerated schedule
  • Cleared the area (~50,000 sq. ft.) by relocating the internal pallet storage and R&D test unit to a new rented facility in Washington and the electric radiator assembly and test facility to the Distribution Centre in Birtley
  • Managed the significant civil changes and the installation of new three-phase power and process gas distribution
  • Led the installation and commissioning of the relocated equipment and the sourcing of a new 110m long overhead crane

 

Refurbishment of the facility and installation of specialist metal processing machines for Spincraft ETG Ltd, Newburn and Benwell sites, Newcastle

I led the refurbishment of a large industrial unit for Spincraft ETG Ltd. including the installation of new machines and equipment to create a dedicated aerospace component manufacturing facility.  The scope included;

  • Development of an efficient layout of machines and processes for the unit, using a 3D modelling package
  • Completion of an electrical survey to understand electrical supply constraints and how to supply all new equipment with the minimum of new electrical installation work
  • Removal of all the existing machinery and redundant services from the unit
  • Installation of new isolated foundations for the new large 5-axis machining and spinning machines
  • Steam cleaning and repainting of the internal roof cladding
  • Grinding and epoxy coating of the floors
  • Installation of new, efficient low-bay LED lighting
  • Design and installation of high-spec partitioning for some specialist inspection operations
  • Co-ordination of the installation of new presses, co-ordinate measuring machines and other specialist equipment
  • Sourcing of a new Fluorescent Penetrant Inspection line
  • Completion of a detailed study to determine the safe procedure for installation of some very large presses
  • Management of all aspects of the delivery  (health and safety, commercial, quality etc.)

 

Project Management of all activities for the start-up of pharmaceutical plant, for Accord Healthcare in Fawdon, Newcastle

I led the planning and co-ordination of all activities for the start-up of commercial pharmaceutical production and to obtain government (MHRA) authorisation for the site, which was achieved in May 2017.  I then continued to support the site leadership team with longer-term planning for a variety of new products and for the future expansion of operations at the site.

 

Site development and relocation, for Dyer Engineering in Harelaw

I led the refurbishment of a large industrial unit which had been left vacant for a number of years.  The scope of the project included;

  • Agreeing a layout for the new facility
  • Modifying the internal power distribution
  • Repair and servicing of the heating system, IT infrastructure, toilets, motorised factory doors, fire alarm system
  • Setting up the office
  • Establishing safe routes of access around the site for employees, visitors and delivery drivers
  • Design and installation of large branding and navigation signs around the site
  • Landscaping
  • Internal and external decoration
  • Negotiating wider scale site improvements with the landlord